• Call Us: +2349088090989
  • Email us: info@chaadengineering.com
  • Working Hours: 09:00-16:30

OUR SOLUTIONS

A Selection of Signature Projects

PROJECTS EXECUTED

PROJECT TITLE:

Cleaning and Removal of Sludge and Heavy Fuel Oil (HFO) Products from Two Refinery Feed Storage Tanks - 2023
CLIENT: NIGER DELTA PETROLEUM RESOURCES (NDPR)

PROJECT TITLE:

Cleaning and Overhaul of Waterbox Cooler and Accessories of Trains 2 and 3 of the Ogbele Refinery - 2023
CLIENT: NIGER DELTA PETROLEUM RESOURCES (NDPR)

PROJECT TITLE:

Rehabilitation and Installation of Low Pressure (LP) Flare for Utorogu Nag-2 Gas Plant - 2023
CLIENT: NIGERIAN PETROLEUM DEVELOPMENT COMPANY LIMITED (NPDC/NDWESTERN)

PROJECT TITLE:

Engineering, Procurement, Installation, Commissioning of Remote Monitoring Units for Cathodic Protection (Pilot Run) - 2023
CLIENT: SHELL PETROLEUM DEVELOPMENT COMPANY (SPDC)

PROJECT TITLE:

Inspection and Replacement of Damaged Rails and Base Plate at OVH Magcobar Jetty Portharcourt-2023
CLIENT: ADANO ENGINEERING COMPANY NIGERIA LIMITED-2023

PROJECT TITLE:

Bitumen Loading Pump Procurement/Fabrication Decommissioning/Installation & Commissioning - 2023
CLIENT: ADANO ENGINEERING COMPANY NIGERIA LIMITED

PROJECT TITLE:

ICSS Works for Sapele Accelerated AG Compressor Installation Project - 2023
CLIENT: SEPLAT PETROLEUM DEVELOPMENT COMPANY

PROJECT TITLE:

Engineering, Procurement, Installation, Commissioning of Remote Monitoring Units for Cathodic Protection - 2023
CLIENT: HEIRSHOLDING OIL & GAS LIMITED (HHOG)

PROJECT TITLE:

OGBELE Refinery Train 1 Turn Around Maintenance Project - 2022
CLIENT: NIGER DELTA PETROLEUM RESOURCES (NDPR)

PROJECT TITLE:

Procurement of Electrical Materials for Sapele Accelerated AG Compressor Installation Project -2022
CLIENT: SEPLAT PETROLEUM DEVELOPMENT COMPANY

PROJECT TITLE:

Redesign of Plant-Wide AGBADA NAG Fire and Gas System - 2021
CLIENT: MAKON ENGINEERING AND TECHNICAL SERVICES (MAKON)

PROJECT TITLE:

Design, Procurement, Upgrade, Configuration, Integration, and Optimization of Integrated Control and Safety Systems (ICSS) for the AGBADA1, AGBADA AGG, and AGBADA NAG (OML 17 Facilities) - 2021
CLIENT: SHELL PETROLEUM DEVELOPMENT COMPANY (SPDC)

PROJECT TITLE:

Engineering and Procurement of Agbada NAG Aircraft Warning Light Systems. - 2021
CLIENT: SHELL PETROLEUM DEVELOPMENT COMPANY OF NIGERIA (SPDC)

PROJECT TITLE:

Instrumentation and Integration of Wells 39T & 40LS Flowlines to Ughelli-East Gas Plant Emerson DeltaV Control and Safety Systems - 2021
CLIENT: KOHASA ENGINEERING COMPANY LIMITED

PROJECT TITLE:

ENGINEERING, PROCUREMENT, CONSTRUCTION, INSTALLATION OF 24” X 1.7KM ALTERNATIVE Service Flare Gas line at Nag-2 Plant – 2021
CLIENT: NIGERIAN PETROLEUM DEVELOPMENT COMPANY LIMITED (NPDC)/ND WESTERN

PROJECT TITLE:

Utorogu High pressure (HP) Flare Rehabilitation and Installation Project. - 2021
CLIENT: NIGERIAN PETROLEUM DEVELOPMENT COMPANY LIMITED (NPDC)

PROJECT TITLE:

Procurement, Instrumentation, & Maintenance Works for Ughelli-East Gas Handling Facility - 2021
CLIENT: NIGERIAN PETROLEUM DEVELOPMENT COMPANY LIMITED (NPDC)/ND WESTERN

PROJECT TITLE:

Procurement of AGBADA NAG Balance of Plant Mechanical Valves and equipment- 2020
CLIENT: MAKON ENGINEERING AND TECHNICAL SERVICES (METS)

PROJECT TITLE:

Instrumentation and Integration of 3 x6” x 0.6km Flowlines to the Ughelli- East Emerson DeltaV Control System. - 2018
CLIENT: EBISTAN GLOBAL SERVICES/NPDC (OML 34)

REQUEST FREE CONSULTATION AND LETS DO IT!